DATA PROYEK KONSTRUKSI YANG TELAH DIKERJAKAN

NO.

PROJECT

LOCATION

YEAR

OWNER

VALUE

1.

Lanjutan Pelapisan Jalan Masuk dan Halaman kantor ( 2.870 M2 )

Balikpapan

(KAL-TIM)

2014

DISHUB

Rp. 369,300,000

2.

Perencanaan Interior, Arsitektur, Struktur & MEP Gedung Kantor & Warehouse  fasilitas

Balikpapan

(KAL-TIM)

2014

PT. Pangansari Utama

Rp. 181,207,180

3.

Borpile and Foundation Raw Meal Based Flue Gas Desulfurization  for P-12 Power Plant 55 MW, Tarjun

Kotabaru

(KAL-SEL)

2014

PT. KELSRI

Rp. 2,352,552,869

4.

Construction for Floating Passanger Jetty at TOTAL INDONESIE Sub PT PSP (Jasa)

Handil

2014

PT. Prima Selaras Perkasa (Total Indonesie)

Rp. 3.890.000.000

5.

Phase II Line 6 Concentrate Pipeline Installation MP 66 – MP 74. (KSO PT. Johntraco Indotama)

Tembagapura (TIMIKA)

2017

PT. Freeport Indonesia

Rp. 31,178,878,123

 

6.

Bathymetry & Hydro Oceanography of the Senipah Gas Turbine Plant

Pamedas, Samboja, KUKAR, KALTIM

2018

PT. Arung Rekayasa Unggul

Rp. 284,625,000

7.

Soil Investigasi of The Senipah Gas Turbin

Pamedas, Samboja, KUKAR, KALTIM

2018

PT. Arung Rekayasa Unggul

Rp. 110,078,000

8.

Refurbishment Tank Farm at Merak Blending Plant for Blastiing and Painting and Minor Mechanical and Stuctural Repair PT. Castrol Indonesia (Sub PT. Petra Energy Internasional)

Cilegon, Banten

2017

PT. Castrol Indonesia

Rp. 2.623,011,200

9.

Construction of Special Terminal (Terminal Khusus) for Plantation & Palm Oil Mill of PT. Nunukan Jaya Lestari (SUB PT. Petra Energy Internasional)

Seimanggaris, Nunukan, KALTARA

2018-2019

PT. Nunukan Jaya Lestari

Rp. 5,661,977,257

10.

Jasa borpile Dia 400mm  9 tititk Area Condensor PLTGU PAmedas

Pamedas, Samboja, KUKAR, KALTIM

2019

PT. Hana Nuansa Pratama

Rp. 85,000,000

Jam